Wednesday 18 March 2009

Site visit

They were meant to start the frames on Monday, but in Adelaide we had rain so I don't think anyone would have been on site so I decided to go down and have a look Tuesday and see what was happening.

I left straight from work and found it will take under 45 mins to get home which is fantastic and not much stop start traffic, but 100 km cruising!

Got to the site and saw not much had happened at all. The plumbing is all done just waiting for the roof anf gutters to be connected up, but no framing has started yet. The wood was in a pile, but that was it. It was a nice drive and I wish I was living there now, but instead I then had to drive home, which took about 1hr 20 due to the one way expressway not going my way :(

Good drive, but not much is happening. I am very anxious, but maybe no visit this weekend, but will go down again the following weekend and fingers crossed for some framing up.

Saturday 14 March 2009

Frames to go up Monday

The developer sent an email the other day advising that the frames should be going up Monday. This is fantastic as it has been a slab for so long. It may even require me to go for a drive on Monday night to see if anything has happened to my cottage (as there are a total of 24 being built at the same time) and take photos or I might try and wait until the weekend.

Monday 9 March 2009

New Front Loader Washing Machine

Picked up new front loader yesterday from Good Guys for $770. Can't wait to try it when I move into my new place :)

Bosch WAE20261AU Maxx EuroWasher http://www.boschappliances.com.au/content.asp?document_id=588&category_id=86

Friday 6 March 2009